They are also planning to configure the nearby US12 and State Highway 3 intersections to enhance traffic flow and improve safety between the two highways. ITD is proposing to replace the existing bridge with a new two-lane bridge with wider lanes and shoulders. ITD is proposing to replace the existing narrow bridge with dual bridges creating two lanes of traffic in each direction with improved lane and shoulder widths.Īrrow bridge is located 13 miles east of Lewiston on US12. Spalding bridge is located 9 miles East of Lewiston on US95. The community will be able to learn more about the proposed plans, ask questions and provide input on replacing the two bridges.īoth bridges were built over 50 years ago and now ITD is looking to upgrade them to meet current and future traffic needs. ITD will be holding a public meeting on Wednesday November 8th between 4 to 7 p-m at the Clearwater River Casino.
The department is proposing changes to Spalding bridge and Arrow bridge to improve traffic flow and safety. LEWISTON, Idaho - The Idaho Transportation Department is inviting the public to provide input on plans to replace US95 and US12 bridges over the Clearwater River.